AirSprayTech Academy Portable Plural-Component Coating Systems for Contractors Certificate Program

AirSprayTech Academy Certificate Program

Portable Plural-Component Coating Systems for Contractors

Article 24 of 24

Safety, Quality Control, Documentation, and Final Acceptance

A successful plural-component coating project is not defined only by how much material was sprayed or how quickly the work was completed. Success means the crew worked safely, the equipment delivered material within approved limits, the coating met the specification, deviations were resolved, and the contractor produced objective records supporting final acceptance.

Final Acceptance Begins Before Mobilization

Final acceptance should not depend on reconstructing the project after the coating has cured. The acceptance process begins when the contractor reviews the contract, coating specification, manufacturer instructions, safety requirements, inspection plan, and documentation requirements.

Before mobilization, identify:

  • The surfaces and limits of work
  • The specified coating system and approved products
  • Surface-preparation requirements
  • Environmental limits
  • Required component ratio and permitted tolerance
  • Wet- and dry-film-thickness requirements
  • Recoat windows and cure requirements
  • Required inspection methods and standards
  • Required hold points and witness points
  • Repair and nonconformance procedures
  • Turnover-document requirements
  • The people authorized to approve changes and accept the work

Safety and Quality Are Connected

Unsafe work conditions often produce poor coating quality. Inadequate lighting, poor access, insufficient ventilation, uncontrolled heat, improper PPE, rushed shutdowns, and poorly routed hoses make it harder for the crew to apply and inspect the coating correctly.

The project safety plan should address the hazards associated with:

  • High-pressure fluid injection
  • Reactive Components A and B
  • Isocyanates, amines, solvents, pigments, fillers, and other coating ingredients
  • Heated materials, hoses, pumps, and manifolds
  • Flammable liquids, vapors, and ignition sources
  • Compressed air, electrical power, hydraulic power, and stored pressure
  • Respiratory exposure and skin sensitization
  • Confined spaces and restricted-access areas
  • Falls, scaffolds, lifts, ladders, hoses, and trip hazards
  • Abrasive blasting, grinding, dust, noise, and flying debris
  • Spills, waste, environmental release, and emergency response

Minimum Safety-Program Elements

  • Hazard assessment for the work, materials, equipment, and location
  • Current safety data sheets and container labels
  • Hazard Communication training
  • Respiratory-protection program when respirators are required
  • Personal-protective-equipment selection and training
  • Ventilation and exposure-control plan
  • Grounding, bonding, and ignition-control procedures
  • Pressure-relief and lockout or tagout procedures
  • Confined-space program when applicable
  • Emergency medical and high-pressure injection response
  • Spill prevention, containment, and waste-management procedures
  • Daily pretask planning and toolbox communication

The specific requirements depend on the materials, workplace, equipment, task, exposure assessment, regulations, and owner requirements.

Quality Assurance and Quality Control

Function Purpose Examples
Quality assurance Establishes the system intended to produce conforming work. Qualified personnel, approved procedures, training, equipment control, purchasing controls, document control, and audit programs
Quality control Measures and verifies the actual work. Environmental readings, surface tests, ratio tests, film-thickness measurements, cure checks, inspection reports, and repair verification

Quality assurance asks whether the contractor has a reliable system. Quality control asks whether the specific work meets the requirements.

Develop an Inspection and Test Plan

An inspection and test plan organizes the work into verifiable stages. For each stage, it should identify:

  • The characteristic or condition to be inspected
  • The governing requirement
  • The inspection or test method
  • The acceptance criteria
  • The inspection frequency and locations
  • The instrument or equipment required
  • The person responsible for the test
  • The required record
  • The applicable hold or witness point
  • The authority required for release to the next operation

Hold Points and Witness Points

A hold point prevents work from advancing until the required inspection is completed and release is authorized. A witness point gives a designated party the opportunity to observe an activity but may permit work to proceed under defined conditions if that party does not attend.

Typical coating-project hold points may include:

  • Acceptance of the substrate before preparation
  • Acceptance of surface preparation before coating
  • Approval of materials, lots, and plural-component configuration
  • Successful calibration and ratio verification
  • Approval of a test section or production standard
  • Inspection of each coat before overcoating
  • Approval of repairs before final coating
  • Final inspection before placing the system into service

The contractor should not cover, coat, insulate, bury, or enclose work that is awaiting a required hold-point inspection.

Control the Project Documents

The crew must work from the correct documents. Document control should identify:

  • Current project specification and drawings
  • Approved coating schedule and product list
  • Current product data sheets and safety data sheets
  • Current equipment and component manuals
  • Approved work plans and application procedures
  • Referenced standards and approved amendments
  • Technical clarifications, change orders, and written manufacturer guidance
  • Inspection forms and acceptance criteria

Remove obsolete documents from active use. Record revision numbers and dates so the final file shows which requirements governed the work.

Control Inspection and Test Instruments

Measurements are only useful when the instrument is suitable, identified, properly maintained, and within its required calibration or verification status.

  • Assign each instrument a unique identification number.
  • Record manufacturer, model, serial number, range, and resolution.
  • Maintain calibration certificates when required.
  • Verify operation before and after use when the procedure requires it.
  • Protect instruments from impact, contamination, temperature extremes, and moisture.
  • Remove damaged or overdue instruments from service.
  • Evaluate previous measurements if an instrument is later found outside tolerance.

Inspection Through the Complete Work Sequence

Work Stage Typical Verification
Material receipt Product, component, quantity, color, lot, expiration, container condition, storage, and approved submittal
Equipment setup Proportioner configuration, pumps, meters, hoses, heaters, mixer, gun, tip, grounding, and safety devices
Surface preparation Cleanliness, profile, contaminants, dust, defects, repairs, edges, welds, and prepared-area protection
Environmental conditions Air temperature, surface temperature, relative humidity, dew point, ventilation, weather, and forecast
Startup Material conditioning, priming, calibration status, ratio test, temperatures, pressures, test spray, and release
Application Pattern, technique, wet-film thickness, coverage, material usage, environmental conditions, alarms, and interruptions
Between coats Dry-film thickness, cure, cleanliness, defects, repairs, recoat window, and surface preparation
Final inspection Appearance, total thickness, cure, holidays, repairs, adhesion or other tests, completeness, cleanliness, and punch-list status

Daily Quality-Control Reports

The daily report should describe what actually occurred, including acceptable work, delays, interruptions, defects, and corrective actions.

  • Project, date, shift, and exact work location
  • Crew members and responsible supervision
  • Work activities and completed quantities
  • Weather and environmental readings with times
  • Surface condition and preparation results
  • Materials, components, colors, and lot numbers
  • Equipment identification and configuration
  • Calibration, ratio, pressure, temperature, and output results
  • Wet- and dry-film-thickness readings
  • Recoat and cure information
  • Alarms, shutdowns, repairs, and production interruptions
  • Inspections, hold-point releases, and witnesses
  • Nonconforming work and corrective actions
  • Photographs tied to locations and report entries

Do Not Rewrite the Record

Record actual readings and events. Do not discard an unfavorable reading and replace it with a favorable one unless the approved procedure clearly defines how invalid measurements are identified and repeated.

Corrections to paper records should leave the original entry readable, show the corrected entry, and include the date and initials of the person making the correction. Controlled electronic records should preserve revision history when the system permits.

Honest records allow problems to be isolated and corrected. Incomplete or altered records create uncertainty about the entire project.

Control Changes and Technical Clarifications

Field conditions may require a change in material, surface preparation, thinning, equipment configuration, film thickness, recoat procedure, or repair method. The contractor should not make a material technical change based solely on an informal conversation.

Document:

  • The condition requiring clarification
  • The specification or manufacturer requirement involved
  • The proposed change or repair
  • The technical basis for the proposal
  • The person or organization authorizing the change
  • The date, affected area, and implementation instructions
  • Required inspection and acceptance after the change

Nonconforming Work

Nonconforming work is work that does not satisfy an identified requirement. Examples include:

  • Unacceptable surface preparation
  • Application outside environmental limits
  • Failed ratio verification or off-ratio alarm
  • Incorrect material, lot, or mixing configuration
  • Insufficient or excessive film thickness
  • Missed recoat window
  • Incomplete cure, poor adhesion, pinholes, holidays, runs, sags, or contamination
  • Work completed beyond an unreleased hold point
  • Missing or unreliable inspection records

The contractor should:

  1. Identify and segregate the affected area.
  2. Prevent concealment or further work.
  3. Document the requirement and actual condition.
  4. Determine and document the root cause.
  5. Obtain an authorized repair or disposition.
  6. Complete the corrective work.
  7. Reinspect and document acceptance.
  8. Take action to prevent recurrence.

Final Inspection

Final inspection should confirm that the complete coating system—not merely the final visible coat—meets the project requirements.

  • All specified areas are complete.
  • The final surface is clean and free of damage.
  • Appearance is within the specified acceptance criteria.
  • Required dry-film thickness has been achieved.
  • Required cure condition has been verified.
  • Required holiday, adhesion, hardness, or other tests are complete.
  • Edges, welds, penetrations, supports, terminations, and difficult geometry are acceptable.
  • Repairs have been completed and reinspected.
  • Protection, masking, temporary equipment, and waste have been removed.
  • Punch-list items are closed or formally assigned.

The Turnover Package

The turnover package should allow the owner to understand what was installed, where it was installed, how it was inspected, and what future maintenance is required.

  • Approved coating specification and coating schedule
  • Final drawings, marked-up plans, or area maps
  • Product data sheets and safety data sheets
  • Material certificates, lot numbers, quantities, and expiration information
  • Surface-preparation and environmental records
  • Equipment setup, calibration, ratio, pressure, and temperature records
  • Daily quality-control and inspection reports
  • Wet- and dry-film-thickness records
  • Cure, holiday, adhesion, hardness, or other required test results
  • Nonconformance, repair, and reinspection records
  • Approved technical clarifications and changes
  • Final inspection and punch-list records
  • Photographs tied to locations and report numbers
  • Warranty documents and maintenance recommendations
  • Final acceptance or completion statement

Acceptance Does Not Erase Responsibility

Final acceptance confirms that the work has been evaluated under the contract requirements. It does not excuse concealed defects, falsified records, unauthorized substitutions, or failure to follow written manufacturer instructions.

The contractor should retain project records for the period required by the contract, law, company policy, warranty, insurer, and owner.

Professional Project Closeout

  1. Complete the contractor’s final inspection.
  2. Resolve outstanding nonconformances and repairs.
  3. Complete the owner’s or inspector’s punch list.
  4. Verify cure and service-readiness conditions.
  5. Remove equipment, masking, debris, waste, and temporary protection.
  6. Assemble and review the turnover package.
  7. Explain maintenance, cleaning, repair, and service limitations to the owner.
  8. Obtain documented final acceptance.
  9. Conduct a project closeout review with the crew.
  10. Carry lessons learned into the next project.

Technical References and Further Study

Standards and industry references are provided for technical education. Obtain authorized access to the complete current standards and project documents before using them for contractual inspection or acceptance.

Course Conclusion

Portable plural-component coating systems allow contractors to apply demanding, fast-reacting, high-solids coatings under field conditions. Their productivity depends on much more than owning a proportioner. It requires trained people, compatible equipment, controlled materials, verified ratio, disciplined application, safe shutdown, preventive maintenance, inspection, and complete documentation.

The professional contractor understands that every pressure reading, temperature setting, ratio test, film-thickness measurement, maintenance record, and crew decision contributes to the performance of the completed coating system.

Professional Responsibility

This course provides foundational education and does not replace equipment-manufacturer training, coating-manufacturer qualification, project-specific instruction, trade licensing, employer safety programs, professional inspection credentials, or applicable regulatory requirements. Always follow current written instructions, safety data sheets, project specifications, approved procedures, and applicable laws and standards.

Copyright © 2026 Azimuth Spray Systems, LLC. All Rights Reserved.

No part of this material may be reproduced, distributed, transmitted, stored, or used in any form without prior written permission from Azimuth Spray Systems, LLC, except for brief quotations used with proper attribution.

AirSprayTech.com – The Finishing Authority®



Was this article helpful?

Comments:
 

Related Articles
 > Academy Series | Professional Certificate Programs
 > The Language of Finishing: A Paint and Coatings Industry Glossary
 > The Language of Finishing: Paint and Coatings Glossary A–B
 > The Language of Finishing: Paint and Coatings Glossary C–D
 > The Language of Finishing: Paint and Coatings Glossary E–F
 > The Language of Finishing: Paint and Coatings Glossary G–H
 > The Language of Finishing: Paint and Coatings Glossary I–K
 > The Language of Finishing: Paint and Coatings Glossary L–M
 > The Language of Finishing: Paint and Coatings Glossary N–O
 > The Language of Finishing: Paint and Coatings Glossary P–Q
 > The Language of Finishing: Paint and Coatings Glossary R
 > The Language of Finishing: Paint and Coatings Glossary S
 > The Language of Finishing: Paint and Coatings Glossary T
 > The Language of Finishing: Paint and Coatings Glossary U–V
 > The Language of Finishing: Paint and Coatings Glossary W–Z
 > The Language of Finishing: Coatings Standards and Acronyms
 > Airless Spraying - From Pump to Pattern
 > Airless Spraying—From Pump to Pattern | Article 01 of 18 How Airless Spray Equipment Works
 > Airless Spraying—From Pump to Pattern | Article 02 of 18 How to Read an Airless Spray Tip Number
 > Airless Spraying—From Pump to Pattern | Article 03 of 18 How to Choose the Correct Airless Tip Size
 > Airless Spraying—From Pump to Pattern | Article 04 of 18 Understanding Airless Fan Width and Orifice Size
 > Airless Spraying—From Pump to Pattern | Article 05 of 18 The Right Way to Set Airless Spray Pressure
 > Airless Spraying—From Pump to Pattern | Article 06 of 18 The Perfect Airless Spray Pattern
 > Airless Spraying—From Pump to Pattern | Article 07 of 18 Why an Airless Spray Pattern Develops Tails
 > Airless Spraying—From Pump to Pattern | Article 08 of 18 How Tip Wear Wastes Paint and Changes the Pattern
 > Airless Spraying—From Pump to Pattern | Article 09 of 18 Matching the Tip to the Sprayer’s Capacity
 > Airless Spraying—From Pump to Pattern | Article 10 of 18 How Airless Hose Size and Length Affect Performance
 > Airless Spraying—From Pump to Pattern | Article 11 of 18 How to Prime and Start an Airless Sprayer
 > Airless Spraying—From Pump to Pattern | Article 12 of 18 Professional Airless Spray-Gun Technique
 > Airless Spraying—From Pump to Pattern | Article 13 of 18 How to Shut Down, Flush, and Store an Airless Sprayer
 > Airless Spraying—From Pump to Pattern | Article 14 of 18 Airless Troubleshooting: When the Pump Will Not Prime
 > Airless Spraying—From Pump to Pattern | Article 15 of 18 Airless Troubleshooting: Surging, Pulsing, and Pressure Loss
 > Airless Spraying—From Pump to Pattern | Article 16 of 18 Electric, Gas, or Pneumatic Airless Equipment
 > Airless Spraying—From Pump to Pattern | Article 17 of 18 Choosing the Right Airless Sprayer for the Work
 > Airless Spraying—From Pump to Pattern | Article 18 of 18 Airless Safety: Understanding Injection-Injury Hazards
 > Airless Spraying-From Pump to Pattern Certificate of Completion
 > Airless Spraying—From Pump to Pattern | Final Assessment
 > Powder Coating - From Particle To Performance
 > Powder Coating—From Particle to Performance | Article 01 of 32 | The History of Powder Coating
 > Powder Coating—From Particle to Performance | Article 02 of 32 | What Powder Coating Is—and What It Is Not
 > Powder Coating—From Particle to Performance | Article 03 of 32 | What Is Inside a Powder Coating?
 > Powder Coating—From Particle to Performance | Article 04 of 32 | How Powder Coating Is Manufactured
 > Powder Coating—From Particle to Performance | Article 05 of 32 | Thermoset Versus Thermoplastic Powder Coatings
 > Powder Coating—From Particle to Performance | Article 06 of 32 | Epoxy, Polyester, and Epoxy-Polyester Hybrid Powders
 > Powder Coating—From Particle to Performance | Article 07 of 32 | Polyurethane, Acrylic, Fluoropolymer, and Specialty Powders
 > Powder Coating—From Particle to Performance | Article 08 of 32 | Selecting the Right Powder for the Application
 > Powder Coating—From Particle to Performance | Article 09 of 32 | Why Surface Preparation Determines Coating Performance
 > Powder Coating—From Particle to Performance | Article 10 of 32 | Preparing Steel, Aluminum, and Galvanized Surfaces
 > Powder Coating—From Particle to Performance | Article 11 of 32 | Mechanical Surface Preparation for Powder Coating
 > Powder Coating—From Particle to Performance | Article 12 of 32 | Chemical Pretreatment, Rinsing, and Dry-Off
 > Powder Coating—From Particle to Performance | Article 13 of 32 | How Electrostatic Powder Coating Works
 > Powder Coating—From Particle to Performance | Article 14 of 32 | Corona-Charging Powder Guns
 > Powder Coating—From Particle to Performance | Article 15 of 32 | Tribostatic Powder Application
 > Powder Coating—From Particle to Performance | Article 16 of 32 | Fluidized-Bed Powder Coating
 > Powder Coating—From Particle to Performance | Article 17 of 32: Anatomy of a Manual Powder-Coating System
 > Powder Coating—From Particle to Performance | Article 18 of 32: Anatomy of an Automatic Powder-Coating System
 > Powder Coating—From Particle to Performance | Article 20 of 32: Powder Feed, Recovery, Reclaim, and Color Change
 > Powder Coating—From Particle to Performance | Article 21 of 32: Compressed-Air Quality for Powder-Coating Equipment
 > Powder Coating—From Particle to Performance | Article 22 of 32: How to Set Up and Start a Powder-Coating System
 > Powder Coating—From Particle to Performance | Article 23 of 32: Setting Powder Flow, Pattern Air, kV, and Current
 > Powder Coating—From Particle to Performance | Article 24 of 32: Professional Manual Powder-Gun Technique
 > Powder Coating—From Particle to Performance | Article 25 of 32: Setting Up Automatic Guns and Reciprocators
 > Powder Coating—From Particle to Performance | Article 26 of 32: Faraday-Cage Effect, Back Ionization, and Poor Coverage
 > Powder Coating—From Particle to Performance | Article 27 of 32: Curing Powder Coating—Time at Metal Temperature
 > Powder Coating—From Particle to Performance | Article 29 of 32: Measuring Powder-Coating Film Thickness
 > Powder Coating—From Particle to Performance | Article 30 of 32: Testing Adhesion, Cure, Gloss, Color, and Appearance
 > Powder Coating—From Particle to Performance | Article 31 of 32: Powder-Coating Defects and Corrective Action
 > Powder Coating—From Particle to Performance | Article 32 of 32: Powder-Coating Safety, Housekeeping, and Preventive Maintenance
 > Powder Coating—From Particle to Performance | Final Course Assessment
 > Powder Coating—From Particle to Performance | Certificate of Completion
 > Finishing Quality - From Spec to Sign-Off | AirSprayTech Academy
 > Finishing Quality—From Spec to Sign-Off | Article 01 of 28: Quality Begins with the Specification
 > Finishing Quality—From Spec to Sign-Off | Article 02 of 28: From Specification to Control Plan
 > Finishing Quality—From Spec to Sign-Off | Article 03 of 28: Document Control and Traceability
 > Finishing Quality—From Spec to Sign-Off | Article 04 of 28: Incoming Materials and Receiving Inspection
 > Finishing Quality—From Spec to Sign-Off | Article 05 of 28: Incoming Process Water Quality
 > Finishing Quality—From Spec to Sign-Off | Article 06 of 28: Process Water Treatment Systems
 > Finishing Quality—From Spec to Sign-Off | Article 07 of 28 Treating and Releasing Finishing Wastewater
 > Finishing Quality—From Spec to Sign-Off | Article 08 of 28: Surface Cleaning and Contamination Control
 > Finishing Quality—From Spec to Sign-Off | Article 09 of 28 Surface Pretreatment and Conversion Coating Control
 > Finishing Quality—From Spec to Sign-Off | Article 10 of 28 Coating Material Storage, Mixing, and Conditioning
 > Finishing Quality—From Spec to Sign-Off | Article 11 of 28 Compressed-Air Quality and System Control
 > Finishing Quality—From Spec to Sign-Off | Article 12 of 28 Temperature, Humidity, and Environmental Control
 > Finishing Quality—From Spec to Sign-Off | Article 13 of 28 Application Equipment Setup and Process Verification
 > Finishing Quality—From Spec to Sign-Off | Article 14 of 28 Wet-Film Thickness and Application Control
 > Finishing Quality—From Spec to Sign-Off | Article 15 of 28 Dry-Film Thickness Measurement and Control
 > Finishing Quality—From Spec to Sign-Off | Article 16 of 28 Cure Verification and Oven Performance
 > Finishing Quality—From Spec to Sign-Off | Article 17 of 28 Appearance, Color, Gloss, and Texture Inspection
 > Finishing Quality—From Spec to Sign-Off | Article 18 of 28 Coating Adhesion Testing and Interpretation
 > Finishing Quality—From Spec to Sign-Off | Article 19 of 28 Hardness, Impact, Flexibility, and Abrasion Testing
 > Finishing Quality—From Spec to Sign-Off | Article 20 of 28 Corrosion, Chemical, and Environmental Exposure Testing
 > Finishing Quality—From Spec to Sign-Off | Article 21 of 28 Holiday, Porosity, and Coating-Continuity Testing
 > Finishing Quality—From Spec to Sign-Off | Article 22 of 28 Building and Controlling the In-House Finishing Laboratory
 > Finishing Quality—From Spec to Sign-Off | Article 23 of 28 Sampling Plans and Inspection Frequency
 > Finishing Quality—From Spec to Sign-Off | Article 24 of 28 Building the Finishing Process Data Highway
 > Finishing Quality—From Spec to Sign-Off | Article 25 of 28 Nonconformance, Root Cause, and Corrective Action
 > Finishing Quality—From Spec to Sign-Off | Article 26 of 28 Final Product Audit, Acceptance, and Release
 > Finishing Quality—From Spec to Sign-Off | Article 27 of 28 Build a Quality Team That Includes the People Doing the Work
 > Finishing Quality—From Spec to Sign-Off | Article 28 of 28 Your Vendors Are Part of the Quality Team
 > Finishing Quality—From Spec to Sign-Off | Final Assessment
 > Finishing Quality—From Spec to Sign-Off | Certificate Request
 > Paint Shop Planning - From Floor Plan to First Spray
 > Paint Shop Planning—From Floor Plan to First Spray | Article 02 of 28 | Build a Project Team Before You Build the Shop
 > Paint Shop Planning—From Floor Plan to First Spray | Article 03 of 28 | Meet the Authority Having Jurisdiction Early
 > Paint Shop Planning—From Floor Plan to First Spray | Article 04 of 28 | Creating the Owner’s Project Requirements
 > Paint Shop Planning—From Floor Plan to First Spray | Article 05 of 28 | Understanding NFPA 33 and Spray-Application Fire Protection
 > Paint Shop Planning—From Floor Plan to First Spray | Article 06 of 28 | Understanding the NEC in a Paint Shop
 > Paint Shop Planning—From Floor Plan to First Spray | Article 07 of 28 | Flammable and Combustible Liquid Storage
 > Paint Shop Planning—From Floor Plan to First Spray | Article 08 of 28 | Building, Fire, and Mechanical Codes
 > Paint Shop Planning—From Floor Plan to First Spray | Article 09 of 28 | Environmental Permits and Emissions Planning
 > Paint Shop Planning—From Floor Plan to First Spray | Article 10 of 28 | Planning the Shop Layout and Product Flow
 > Paint Shop Planning—From Floor Plan to First Spray | Article 11 of 28 | Spray-Booth and Preparation-Station Selection
 > Paint Shop Planning—From Floor Plan to First Spray | Article 12 of 28 | Air-Makeup and Exhaust-System Planning
 > Paint Shop Planning—From Floor Plan to First Spray | Article 13 of 28 | Planning the Compressed-Air System
 > Paint Shop Planning—From Floor Plan to First Spray | Article 14 of 28 | Electrical Service, Controls, and Hazardous Locations
 > Paint Shop Planning—From Floor Plan to First Spray | Article 15 of 28 | Natural Gas, Heating, and Curing Requirements
 > Paint Shop Planning—From Floor Plan to First Spray | Article 16 of 28 | Fire Suppression, Detection, and Emergency Systems
 > Paint Shop Planning—From Floor Plan to First Spray | Article 17 of 28 | Writing an Equipment Specification Vendors Can Quote
 > Paint Shop Planning—From Floor Plan to First Spray | Article 18 of 28 | How to Compare Paint-Booth Proposals
 > Paint Shop Planning—From Floor Plan to First Spray | Article 19 of 28 | Who Is Responsible for What?
 > Paint Shop Planning—From Floor Plan to First Spray | Article 20 of 28 | Site Preparation and Construction Coordination
 > Paint Shop Planning—From Floor Plan to First Spray | Article 21 of 28 | Change Orders: Where Paint-Shop Budgets Go to Die
 > Paint Shop Planning—From Floor Plan to First Spray | Article 22 of 28 | Pre-Startup Inspection and Documentation
 > Paint Shop Planning—From Floor Plan to First Spray | Article 23 of 28 | Testing Booth Airflow and Pressure
 > Paint Shop Planning—From Floor Plan to First Spray | Article 24 of 28 | Testing Safety Interlocks and Emergency Controls
 > Paint Shop Planning—From Floor Plan to First Spray | Article 25 of 28 | Commissioning the Complete Paint Shop
 > Paint Shop Planning—From Floor Plan to First Spray | Article 26 of 28 | Training Operators and Maintenance Personnel
 > Paint Shop Planning—From Floor Plan to First Spray | Article 27 of 28 | Final Acceptance: Do Not Sign Off Until It Performs
 > Paint Shop Planning—From Floor Plan to First Spray | Article 28 of 28 | Planning for Maintenance, Expansion, and the Next Ten Years
 > Paint Shop Planning—From Floor Plan to First Spray | Article 01 of 28 | Before You Buy a Booth: Define the Finishing Process
 > Paint Shop Planning—From Floor Plan to First Spray | Final Assessment
 > Paint Shop Planning—From Floor Plan to First Spray | Certificate of Completion Request
 > Automotive Refinish - From Repair Plan to Road Ready
 > Automotive Refinish—From Repair Plan to Road Ready | Article 01 of 28 | Start Before the Sandpaper: Vehicle Intake and Refinish Planning
 > Automotive Refinish—From Repair Plan to Road Ready | Article 02 of 28 | PPE Is Part of the Process: Protecting the Automotive Painter
 > Automotive Refinish—From Repair Plan to Road Ready | Article 03 of 28 | Fire, Fumes, and Ignition Sources: Everyday Refinish-Shop Safety
 > Automotive Refinish—From Repair Plan to Road Ready | Article 04 of 28 | A Clean Shop Paints Cleaner Cars: Housekeeping and Contamination Control
 > Automotive Refinish—From Repair Plan to Road Ready | Article 05 of 28 | Know What You Are Painting: Automotive Substrate Identification
 > Automotive Refinish—From Repair Plan to Road Ready | Article 06 of 28 | Clean Before You Cut: Washing, Degreasing, and Contamination Removal
 > Automotive Refinish—From Repair Plan to Road Ready | Article 07 of 28 | Stop Corrosion Before It Starts: Bare Metal and Corrosion Protection
 > Automotive Refinish—From Repair Plan to Road Ready | Article 08 of 28 | Sand With a Purpose: Abrasives, Grit Selection, and Surface Profiles
 > Automotive Refinish—From Repair Plan to Road Ready | Article 09 of 28 | Build It Straight: Fillers, Glazes, Primers, and Sealers
 > Automotive Refinish—From Repair Plan to Road Ready | Article 10 of 28 | Mask the Repair, Not the Mistake: Paper, Plastic, Tape, and Technique
 > Automotive Refinish—From Repair Plan to Road Ready | Article 11 of 28 | Choose the Complete System: Modern Automotive-Refinish Materials
 > Automotive Refinish—From Repair Plan to Road Ready | Article 12 of 28 | Control the Mix: Paint Storage, Mixing Rooms, and Material Management
 > Automotive Refinish—From Repair Plan to Road Ready | Article 13 of 28 | Match It Before You Spray It: Color Tools, Spray-Outs, and Color Acceptance
 > Automotive Refinish—From Repair Plan to Road Ready | Article 14 of 28 | Choose the Right Spray Gun: Match the Equipment to the Finish
 > Automotive Refinish—From Repair Plan to Road Ready | Article 15 of 28 | Feed the Finish: Air-Compressor Operation and Maintenance
 > Automotive Refinish—From Repair Plan to Road Ready | Article 16 of 28 | Keep the Gun Honest: Spray Equipment Operation and Maintenance
 > Automotive Refinish—From Repair Plan to Road Ready | Article 17 of 28 | Paint With a Plan: Professional Basecoat and Clearcoat Application
 > Automotive Refinish—From Repair Plan to Road Ready | Article 18 of 28 | Control the Booth: Airflow, Filters, Lighting, and Maintenance
 > Automotive Refinish—From Repair Plan to Road Ready | Article 19 of 28 | Balance the Booth: Air-Makeup Unit Operation and Maintenance
 > Automotive Refinish—From Repair Plan to Road Ready | Article 20 of 28 | Cure It by the Numbers: Flash, Bake, and Return-to-Service
 > Automotive Refinish—From Repair Plan to Road Ready | Article 21 of 28 | Correct Without Creating: Denibbing, Sanding, and Polishing
 > Automotive Refinish—From Repair Plan to Road Ready | Article 22 of 28 | Put It Back Right: Reassembly Without Damaging the Finish
 > Automotive Refinish—From Repair Plan to Road Ready | Article 23 of 28 | Inspect It Before the Customer Does: Final Quality Control
 > Automotive Refinish—From Repair Plan to Road Ready | Article 24 of 28 | Deliver More Than Shine: Customer Handoff and Fresh-Paint Care
 > Automotive Refinish—From Repair Plan to Road Ready | Article 25 of 28 | Control the Waste Stream: Paint, Solvent, Filters, and Compliance
 > Automotive Refinish—From Repair Plan to Road Ready | Article 26 of 28 | Troubleshoot the Process: Find the Cause Before Repainting
 > Automotive Refinish—From Repair Plan to Road Ready | Article 27 of 28 | Make Quality Repeatable: Procedures, Training, and Team Accountability
 > Automotive Refinish—From Repair Plan to Road Ready | Article 28 of 28 | Road Ready Is Earned: Audit the Complete Refinish Process
 > Automotive Refinish—From Repair Plan to Road Ready | Final Assessment
 > Automotive Refinish—From Repair Plan to Road Ready | Certificate of Completion Request
 > Corrosion Protection for Industrial Coating Contractors - 00 Course Overview
 > Corrosion Protection for Industrial Coating Contractors - Article 01: Understanding Corrosion
 > Corrosion Protection for Industrial Coating Contractors - Article 02: Common Forms of Corrosion
 > Corrosion Protection for Industrial Coating Contractors - Article 03: Evaluating the Structure and Service Environment
 > Corrosion Protection for Industrial Coating Contractors - Article 04: Protective Coatings as the Primary Barrier
 > Corrosion Protection for Industrial Coating Contractors - Article 05: Selecting the Correct Coating System
 > Corrosion Protection for Industrial Coating Contractors - Article 06: Surface Cleanliness and Contaminant Testing
 > Corrosion Protection for Industrial Coating Contractors - Article 07: Abrasive Blasting and Surface-Preparation Standards
 > Corrosion Protection for Industrial Coating Contractors - Article 08: Surface Profile and Anchor Pattern
 > Corrosion Protection for Industrial Coating Contractors - Article 09: Environmental Conditions and Dew Point Control
 > Corrosion Protection for Industrial Coating Contractors - Article 10: Selecting Coating Systems for the Service Environment
 > Corrosion Protection for Industrial Coating Contractors - Article 11: Primers and Their Role in Corrosion Protection
 > Corrosion Protection for Industrial Coating Contractors - Article 12: Intermediate Coats, Finish Coats, and Stripe Coating
 > Corrosion Protection for Industrial Coating Contractors - Article 13: Coating Application Methods and Spray Technique
 > Corrosion Protection for Industrial Coating Contractors - Article 14: Coating Mixing, Thinning, Induction Time, and Pot Life
 > Corrosion Protection for Industrial Coating Contractors - Article 15: Wet Film and Dry Film Thickness Control
 > Corrosion Protection for Industrial Coating Contractors - Article 16: Holidays, Pinholes, and Discontinuity Testing
 > Corrosion Protection for Industrial Coating Contractors - Article 17: Coating Adhesion Testing and Failure Interpretation
 > Corrosion Protection for Industrial Coating Contractors - Article 18: Coating Defects and Failure Diagnosis
 > Corrosion Protection for Industrial Coating Contractors - Article 19: How Coatings and Cathodic Protection Work Together
 > Corrosion Protection for Industrial Coating Contractors - Article 20: Final Inspection, Repair Verification, and Project Documentation
 > Corrosion Protection for Industrial Coating Contractors - Final Assessment
 > Corrosion Protection for Industrial Coating Contractors - Final Certificate of Completion Request
 > Protective Linings for Industrial Coating Contractors | 00 - Course Overview
 > Protective Linings for Industrial Coating Contractors | Article 01 of 20 - Protective Linings: What They Are and Why They Fail
 > Protective Linings for Industrial Coating Contractors | Article 02 of 20 - Understanding the Lining Service Environment
 > Protective Linings for Industrial Coating Contractors | Article 04 of 20 - Selecting a Lining for the Material Being Contained
 > Protective Linings for Industrial Coating Contractors | Article 05 of 20 - Epoxy Linings and Where They Are Used
 > Protective Linings for Industrial Coating Contractors | Article 06 of 20 - Novolac Epoxy Linings for Severe Chemical Service
 > Protective Linings for Industrial Coating Contractors | Article 07 of 20 - Vinyl Ester and Polyester Lining Systems
 > Protective Linings for Industrial Coating Contractors | Article 08 of 20 - Polyurethane, Polyurea, and Elastomeric Linings
 > Protective Linings for Industrial Coating Contractors | Article 09 of 20 - Cementitious and Specialty Lining Systems
 > Protective Linings for Industrial Coating Contractors | Article 10 of 20 - Inspecting Steel and Concrete Before Lining Work Begins
 > Protective Linings for Industrial Coating Contractors | Article 11 of 20 - Preparing Steel for Protective-Lining Application
 > Protective Linings for Industrial Coating Contractors | Article 12 of 20 - Preparing Concrete for Protective Linings
 > Protective Linings for Industrial Coating Contractors | Article 13 of 20 - Moisture in Concrete: When a Lining Should Not Be Applied
 > Protective Linings for Industrial Coating Contractors | Article 14 of 20 - Environmental Conditions, Dew Point, and Condensation Control
 > Protective Linings for Industrial Coating Contractors | Article 15 of 20 - Mixing, Induction Time, Pot Life, and Material Temperature
 > Protective Linings for Industrial Coating Contractors | Article 16 of 20 - Applying High-Build and Plural-Component Linings
 > Protective Linings for Industrial Coating Contractors | Article 17 of 20 - Stripe Coating, Edges, Welds, Penetrations, and Difficult Areas
 > Protective Linings for Industrial Coating Contractors | Article 18 of 20 - Film Thickness, Recoat Windows, Curing, and Return to Service
 > Protective Linings for Industrial Coating Contractors | Article 19 of 20 - Inspecting Protective Linings
 > Protective Linings for Industrial Coating Contractors | Article 20 of 20 - Final Acceptance, Repairs, and Lining Maintenance
 > Protective Linings for Industrial Coating Contractors - Final Assessment
 > Protective Linings for Industrial Coating Contractors | Certificate of Completion Request
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | 00 - Course Overview
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 01 of 20 - Why Moisture Causes Coating and Flooring Fail
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 03 of 20 - Moisture Vapor Versus Hydrostatic Pressure
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 02 of 20 - How Moisture Moves Through Concrete
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 04 of 20 - Sources of Moisture in Concrete Slabs and Str
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 05 of 20 - Recognizing Moisture-Related Coating Failures
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 06 of 20 - Relative-Humidity Testing of Concrete Slabs
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 07 of 20 - Calcium-Chloride Moisture-Vapor-Emission Test
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 08 of 20 - Electronic Moisture Meters and Surface-Moistu
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 09 of 20 - Concrete pH and Alkalinity at the Bond Line
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 10 of 20 - Dew Point, Condensation, and Environmental Co
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 11 of 20 - Osmotic Blistering, Delamination, and Efflore
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 12 of 20 - When a Coating Should Not Be Applied
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 13 of 20 - Selecting a Moisture-Mitigation System
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 14 of 20 - Surface Preparation for Moisture-Mitigation M
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 15 of 20 - Applying Moisture-Mitigation Membranes
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 16 of 20 - Pinholes, Holidays, and Membrane Inspection
 > Moisture Vapor Barriers and Mitigation Membranes for Industrial Coating Contractors | Article 17 of 20 - Primers, Underlayments, Adhesives, and System
 > Moisture Vapor Management | 18 - Repairing Coating and Flooring Failures
 > Moisture Vapor Management | 19 - Documentation, Warranties, and Contractor Liability
 > Moisture Vapor Management | 20 - Complete Moisture-Management Plan
 > Moisture Vapor Management | Course Assessment
 > Moisture Vapor Management | Certificate Request
 > Commercial and Industrial Floor Coatings - Course Overview
 > Commercial and Industrial Floor Coatings | Article 01 of 24 | What Floor Coatings Must Do
 > Commercial and Industrial Floor Coatings | Article 02 of 24 | Defining the Service Environment
 > Commercial and Industrial Floor Coatings | Article 03 of 24 | Evaluating Existing Concrete and Previous Floors
 > Commercial and Industrial Floor Coatings | Article 04 of 24 | Concrete Moisture and Floor-Coating Failure
 > Commercial and Industrial Floor Coatings | Article 05 of 24 | Removing Oil, Grease and Chemical Contamination
 > Commercial and Industrial Floor Coatings | Article 06 of 24 | Mechanical Surface Preparation
 > Commercial and Industrial Floor Coatings | Article 07 of 24 | Concrete Surface Profile and Preparation Acceptance
 > Commercial and Industrial Floor Coatings | Article 08 of 24 | Repairing Cracks, Joints, Spalls and Damaged Concrete
 > Commercial and Industrial Floor Coatings | Article 09 of 24 | Primers, Patches, Underlayments and Moisture Mitigation
 > Commercial and Industrial Floor Coatings | Article 10 of 24 | Understanding Resinous Floor-Coating Chemistries
 > Commercial and Industrial Floor Coatings | Article 11 of 24 | Epoxy Floor-Coating Systems
 > Commercial and Industrial Floor Coatings | Article 12 of 24 | Polyurethane and Polyaspartic Floor Coatings
 > Commercial and Industrial Floor Coatings | Article 13 of 24 | Urethane-Cement Flooring for Heavy-Duty and Sanitary Service
 > Commercial and Industrial Floor Coatings | Article 14 of 24 | Methyl Methacrylate and Rapid-Return Flooring Systems
 > Commercial and Industrial Floor Coatings | Article 15 of 24 | Broadcast, Slurry, Mortar, and Self-Leveling Floor Systems
 > Commercial and Industrial Floor Coatings | Article 16 of 24 | Slip Resistance, Texture, Cleanability, and Appearance
 > Commercial and Industrial Floor Coatings | Article 17 of 24 | Coves, Drains, Penetrations, Edges, and Floor Transitions
 > Commercial and Industrial Floor Coatings | Article 18 of 24 | Mixing, Staging, Pot Life, and Installation Sequence
 > Commercial and Industrial Floor Coatings | Article 19 of 24 | Coverage, Film Thickness, Aggregate, and Material Control
 > Commercial and Industrial Floor Coatings | Article 20 of 24 | Environmental Conditions, Cure, Recoat Windows, and Return to Service
 > Commercial and Industrial Floor Coatings | Article 21 of 24 | Warehouse, Manufacturing, Vehicle and Aircraft-Hangar Floors
 > Commercial and Industrial Floor Coatings | Article 22 of 24 | Food, Beverage, Sanitary, Healthcare and Cleanroom Floors
 > Commercial and Industrial Floor Coatings | Article 23 of 24 | Inspection, Testing, Defects and Repairs
 > Commercial and Industrial Floor Coatings | Article 24 of 24 | Estimating, Documentation, Warranties, Maintenance and Final Acceptance
 > Commercial and Industrial Floor Coatings | Final Course Assessment
 > Commercial and Industrial Floor Coatings | Certificate of Completion Request
 > Commercial and Industrial Roof Coatings | 00 Certificate Program
 > Commercial and Industrial Roof Coatings | 01 of 25: What They Must Dand
 > Commercial and Industrial Roof Coatings | 02 of 25 | Coatings vs. Membranes
 > Commercial and Industrial Roof Coatings | 03 of 25 | Roof Assemblies and Substrates
 > Commercial and Industrial Roof Coatings | 04 of 25 | Reading the Specification
 > Commercial and Industrial Roof Coatings | 05 of 25 | Codes, Fire, Wind, and Energy
 > Commercial and Industrial Roof Coatings | 06 of 25 | New-Construction Readiness
 > Commercial and Industrial Roof Coatings | 07 of 25 | Restore or Replace
 > Commercial and Industrial Roof Coatings | 08 of 25 | Roof Moisture Surveys
 > Commercial and Industrial Roof Coatings | 09 of 25 | Drainage and Ponding Water
 > Commercial and Industrial Roof Coatings | 10 of 25 | Repairs Before Coating
 > Commercial and Industrial Roof Coatings | 11 of 25 | Cleaning and Contamination Removal
 > Commercial and Industrial Roof Coatings | 12 of 25 | Surface Preparation by Substrate
 > Commercial and Industrial Roof Coatings | 13 of 25 | Adhesion Testing
 > Commercial and Industrial Roof Coatings | 14 of 25 | Primers and Tie Coats
 > Commercial and Industrial Roof Coatings | 15 of 25 | Elastomeric Coatings
 > Commercial and Industrial Roof Coatings | 16 of 25 | Acrylic Systems
 > Commercial and Industrial Roof Coatings | 17 of 25 | Silicone Systems
 > Commercial and Industrial Roof Coatings | 18 of 25 | Polyurethane Systems
 > Commercial and Industrial Roof Coatings | 19 of 25 | PMMA Membranes
 > Commercial and Industrial Roof Coatings | 20 of 25 | Polyurea Membranes
 > Commercial and Industrial Roof Coatings | 21 of 25 | Spray Equipment
 > Commercial and Industrial Roof Coatings | 22 of 25 | Weather and Cure
 > Commercial and Industrial Roof Coatings | 23 of 25 | Inspection and Repairs
 > Commercial and Industrial Roof Coatings | 24 of 25 | Specifications and Warranties
 > Commercial and Industrial Roof Coatings | 25 of 25 | Technical Glossary
 > Commercial and Industrial Roof Coatings | Course Assessment
 > Commercial and Industrial Roof Coatings | Certificate Request
 > Professional Line Striping for Contractors | Course Overview
 > Professional Line Striping for Contractors | Article 01 of 24 | The Contractor’s Role
 > Professional Line Striping for Contractors | Article 02 of 24 | Plans, Specifications and Scope
 > Professional Line Striping for Contractors | Article 03 of 24 | Site Survey and Prejob Evaluation
 > Professional Line Striping for Contractors | Article 04 of 24 | MUTCD Marking Fundamentals
 > Professional Line Striping for Contractors | Article 05 of 24 | Accessible Parking Spaces
 > Professional Line Striping for Contractors | Article 06 of 24 | Fire Lanes and Restricted Areas
 > Professional Line Striping for Contractors | Article 07 of 24 | Parking-Lot Layout and Traffic Flow
 > Professional Line Striping for Contractors | Article 08 of 24 | Measuring and Layout Control
 > Professional Line Striping for Contractors | Article 09 of 24 | Pavement and Existing Markings
 > Professional Line Striping for Contractors | Article 10 of 24 | Surface Preparation and Marking Removal
 > Professional Line Striping for Contractors | Article 11 of 24 | Selecting Marking Materials
 > Professional Line Striping for Contractors | Article 12 of 24 | Marking Coating Chemistries
 > Professional Line Striping for Contractors | Article 13 of 24 | Glass Beads and Retroreflectivity
 > Professional Line Striping for Contractors | Article 14 of 24 | Striping Machines, Guns and Tips
 > Professional Line Striping for Contractors | Article 15 of 24 | Equipment Setup and Spray Control
 > Professional Line Striping for Contractors | Article 16 of 24 | Width, Thickness and Coverage
 > Professional Line Striping for Contractors | Article 17 of 24 | Stencils, Symbols and Arrows
 > Professional Line Striping for Contractors | Article 18 of 24 | Weather, Moisture, Drying and Cure
 > Professional Line Striping for Contractors | Article 19 of 24 | Work-Zone Traffic Control
 > Professional Line Striping for Contractors | Article 20 of 24 | Crew Positioning, Communication and PPE
 > Professional Line Striping for Contractors | Article 21 of 24 | Estimating Line Striping Work
 > Professional Line Striping for Contractors | Article 22 of 24 | Scheduling and Managing Crews
 > Professional Line Striping for Contractors | Article 23 of 24 | Inspection, Defects and Acceptance
 > Professional Line Striping for Contractors | Article 24 of 24 | Documentation, Maintenance and Growth
 > Professional Line Striping for Contractors | Course Assessment
 > Professional Line Striping for Contractors | Certificate Request
 > Academy Educational Standards and Editorial Policy
 > Secondary Containment Coating Systems | 00 Course Overview
 > Secondary Containment Coating Systems | Article 01 of 24 | Purpose and Responsibility
 > Secondary Containment Coating Systems | Article 02 of 24 | Defining the Service Environment
 > Secondary Containment Coating Systems | Article 03 of 24 | Chemical Exposure Variables
 > Secondary Containment Coating Systems | Article 04 of 24 | Concrete and Steel Structures
 > Secondary Containment Coating Systems | Article 06 of 24 | Concrete Moisture and Failure
 > Secondary Containment Coating Systems | Article 07 of 24 | Embedded Concrete Contamination
 > Secondary Containment Coating Systems | Article 08 of 24 | Mechanical Concrete Preparation
 > Secondary Containment Coating Systems | Article 09 of 24 | Steel Surface Preparation
 > Secondary Containment Coating Systems | Article 10 of 24 | Primers and Bonding Layers
 > Secondary Containment Coating Systems | Article 12 of 24 | Vinyl Ester Systems
 > Secondary Containment Coating Systems | Article 14 of 24 | Fiberglass-Reinforced Linings
 > Secondary Containment Coating Systems | Article 15 of 24 | Coves, Joints, Drains, and Penetrations
 > Secondary Containment Coating Systems | Article 16 of 24 | Mixing, Staging, and Pot Life
 > Secondary Containment Coating Systems | Article 17 of 24 | Application Methods and Equipment
 > Secondary Containment Coating Systems | Article 18 of 24 | Film Thickness and Continuity
 > Secondary Containment Coating Systems | Article 19 of 24 | Environmental Conditions and Cure
 > Secondary Containment Coating Systems | Article 20 of 24 | Inspection, Testing, and Final Acceptance
 > Secondary Containment Coating Systems | Article 21 of 24 | Defects, Failure Analysis, and Repairs
 > Secondary Containment Coating Systems | Article 22 of 24 | Spill Response and Return to Service
 > Secondary Containment Coating Systems | Article 23 of 24 | Inspection, Maintenance, and Service Life
 > Secondary Containment Coating Systems | Article 24 of 24 | Estimating and Contractor Responsibility
 > Secondary Containment Coating Systems | Course Assessment
 > Secondary Containment Coating Systems | Certificate of Completion Request
 > Portable Plural-Component Coating Systems | 00 Course Overview
 > Portable Plural-Component Systems | Article 01 of 24 | Understanding the System
 > Portable Plural-Component Systems | Article 02 of 24 | Ratios and Stoichiometry
 > Portable Plural-Component Systems | Article 03 of 24 | Pot Life and Cure
 > Portable Plural-Component Systems | Article 04 of 24 | Materials and Applications
 > Portable Plural-Component Systems | Article 05 of 24 | Reading the Documents
 > Portable Plural-Component Systems | Article 06 of 24 | How Proportioners Work
 > Portable Plural-Component Systems | Article 07 of 24 | Selecting a Proportioner
 > Portable Plural-Component Systems | Article 08 of 24 | Pails, Drums, Totes, and Feed Pumps
 > Portable Plural-Component Systems | Article 09 of 24 | Pumps and Ratio Control
 > Portable Plural-Component Systems | Article 10 of 24 | Material Conditioning
 > Portable Plural-Component Systems | Article 11 of 24 | Heating and Temperature Control
 > Portable Plural-Component Systems | Article 12 of 24 | Filters, Valves, Gauges, and Sensors
 > Portable Plural-Component Systems | Article 13 of 24 | Manifolds and Mixers
 > Portable Plural-Component Systems | Article 14 of 24 | Spray Guns, Tips, and Chambers
 > Portable Plural-Component Systems | Article 15 of 24 | Building a Mobile Rig
 > Portable Plural-Component Systems | Article 16 of 24 | Hoses and Connections
 > Portable Plural-Component Systems | Article 17 of 24 | Calibration and Ratio Testing
 > Portable Plural-Component Systems | Article 18 of 24 | Jobsite Setup and Startup
 > Portable Plural-Component Systems | Article 19 of 24 | Pressure and Spray Technique
 > Portable Plural-Component Systems | Article 20 of 24 | Film Thickness and Cure
 > Portable Plural-Component Systems | Article 21 of 24 | Correcting Off-Ratio Material
 > Portable Plural-Component Systems | Article 22 of 24 | Shutdown and Flushing
 > Portable Plural-Component Systems | Article 23 of 24 | Troubleshooting and Maintenance
 > Portable Plural-Component Coating Systems | Course Assessment
 > Portable Plural-Component Systems | Certificate of Completion Request